
Systems
Fast cure, hard finish, no yellowing
Polyaspartic is what you use when the space cannot be out of service for a week and when the floor is going to see sunlight. It cures in hours rather than days and it holds its color where standard epoxy goes amber.
Pour this floor
Tell us the space and rough size. Or call (941) 504-9132.
Detail
Speed is the headline
A polyaspartic system can go down and return to foot traffic the same day, with vehicles back on it within twenty-four hours in the right conditions. For a working shop or a retail floor that is the whole argument: you are not closed for a week.
The trade-off is working time. Polyaspartic sets fast, which means it is unforgiving to install. It is not a material to learn on, and it is one reason a lot of crews quietly steer people back to epoxy.

UV stability
Standard epoxy ambers under ultraviolet light. Indoors that never matters. On a lanai, a pool deck, or a garage that spends all afternoon with the door up, it very much does. Polyaspartic is UV stable, so a gray stays gray and a white stays white.
That is why our outdoor work almost always finishes with a polyaspartic or polyurea topcoat regardless of what is underneath it.
Where it fits with epoxy
The two are not rivals. The common build is an epoxy primer and base for bond and thickness, then a polyaspartic clear for speed, hardness and UV. You get the best of both, and it is what we specify on most residential garages.
Preparation
What happens before any resin comes out
Every system on this page lives or dies on the same thing, and it is not the resin. It is whether the slab underneath was opened up properly first.
We diamond grind every floor. Progressively finer diamond tooling runs across the slab until the surface is opened to a profile the coating can key into mechanically, with the dust going into a vacuum rather than into the house. Acid etching, which is what most retail kits instruct, barely touches a hard-troweled slab.
Then we read moisture. Florida slabs sit on sand with a high water table and move vapor upward continuously; trap that under a film-forming coating and you get bubbling and delamination that can only be ground off and redone. Where the numbers come back high we specify a moisture-tolerant primer instead of pretending the problem is not there.
Cracks get chased out to a clean edge and filled rather than skimmed over, spalls and pop-outs get rebuilt, and any previous coating comes off entirely. Only when the slab is sound, open and dry does anything get mixed.
The finish is what you see. The grind underneath it is what decides whether you are still happy in year eight, and it is where we spend the time other quotes save money.
It is also why we will occasionally tell someone their slab needs repair before it needs a coating. A floor that should be fixed structurally is not a floor we will put resin on, because the crack comes back through and then it is our name on it.
Related work
Epoxy Garage Floors
Epoxy earned its reputation twice over: once as the toughest thing you can put on a garage slab, and once as the…
See the system →Full Flake Garage Floor Coatings
A full flake floor is broadcast to refusal across the whole slab rather than scattered for effect. The result is a…
How it works →Metallic Epoxy Flooring
Metallic is the reason this company exists. Reflective pigment suspended in clear resin, then moved with air and…
Read the detail →Commercial Epoxy Flooring
Commercial work has a different brief to residential. It has to meet a standard, it has to survive traffic that never…
What it suits →Questions
Polyaspartic Floor Coatings questions
How much does polyaspartic floor coatings cost?
Price follows square footage, the condition of the slab and the system you choose. A sound slab that only needs grinding costs far less to prepare than one with cracks, old coating or a moisture problem. We look at the floor and give you a real number rather than a range that means nothing.
How long does polyaspartic floor coatings take?
Most residential work is two to four days on site depending on size and system. Commercial and industrial floors are scheduled around your hours and often run nights or weekends. You get exact dates before we start, including when you can walk on it and when you can put weight on it.
Do you grind the floor first?
Always. Diamond grinding is the only way to get a profile the coating can key into, and it is the single biggest reason floors either last or fail. We do not acid etch and we do not coat over a sealed slab.
What about moisture in the slab?
Florida slabs move water upward constantly, and vapor trapped under a coating is a guaranteed failure. We take a reading before quoting. If the numbers are high we specify a moisture-tolerant primer rather than pretending the problem is not there.
Can you match a color or a look I have seen?
Usually. We carry eighteen flake blends and mix metallic per floor, so bring a photo, a cabinet door or a paint chip and we will get close. We put samples down in your own light before you commit.
Do you work outside Sarasota?
Yes. We cover a 120-mile radius from Sarasota, which is twenty-four counties from Naples up to Ocala and across to Orlando. Check the service areas page or call and ask.
Send us the space. We will send back a number.
Rough size and a photo is enough to start. We cover Sarasota and twenty-four counties around it, so tell us where you are and we will tell you when we can get there.
Pour this floor
Or call (941) 504-9132.
